AS9100 Documentation Requirements: What Auditors Actually Check (2026)

This guide breaks down what AS9100 Rev D actually requires in documented information — from first article inspection and traceability records to counterfeit parts prevention and configuration management. It explains which records auditors pull first, where most aerospace suppliers fall short, and how AS9100 documentation differs from a standard ISO 9001 system.

A clause-by-clause breakdown of what your aerospace QMS documentation needs — and where most suppliers fall short

Affiliate Disclosure: Some links in this article are affiliate links. If you purchase through them, The Standards Navigator may earn a commission at no additional cost to you.


The Documentation Gap That Fails Aerospace Audits

AS9100 documentation requirements cover the documented information needed to operate and demonstrate an aerospace QMS, along with aerospace-specific records and controls in areas such as configuration management, traceability, counterfeit parts prevention, first article inspection, and FOD control. The exact documents and records an organization maintains depend on its processes, applicable requirements, and customer flow-downs.

AS9100 documentation isn’t ISO 9001 paperwork with an aerospace label stuck on it. Traceability records, first article inspection (FAI) data, and configuration management records aren’t background paperwork — auditors use them as objective evidence that aerospace parts were manufactured and controlled according to applicable requirements.

Most suppliers assume a quality manual and a stack of procedures covers it. Then an auditor selects a part number, asks for the traceability record behind its FAI, and finds the two don’t connect — what looked like a minor gap becomes a major nonconformance.

Whether you’re mapping documentation before your first Stage 1 audit or checking an existing system against Rev D, this breaks down exactly what auditors pull first — and where the gaps usually are.

FROM THE SHOP FLOOR: I’ve sat across the table from an AS9100 auditor who skipped the quality manual entirely and went straight for first article inspection records on a part we’d shipped eight months earlier. We had the FAI — what we didn’t have was the linked traceability record showing which material heat lot went into it. That gap alone became a major finding. Auditors aren’t grading your paperwork; they’re testing whether your records actually trace back to the part in front of them.

👉 Most AS9100 documentation gaps don’t surface until an auditor asks for a specific record — by then it’s too late to fix quietly. Run the AS9100 Rev D Gap Assessment Checklist before your next audit and find out exactly where your documentation stands.

In this guide:

  • What AS9100 documented information actually requires — and where it goes beyond ISO 9001
  • Whether you still need a quality manual under Rev D
  • The core records auditors pull first: FAI, traceability, counterfeit parts, FOD
  • Two documentation areas most suppliers underbuild
  • Common findings and how to close them before your audit
  • Where to buy the standard and find training if you’re building this from scratch


👉 Start Here


What “Documented Information” Actually Means Under AS9100

AS9100 Rev D uses the same “documented information” language as ISO 9001 — but the aerospace-specific clauses layer on requirements that don’t exist in a standard ISO 9001 system at all.

AS9100 Rev D does not explicitly require a document called a quality manual. The practical takeaway is that eliminating a document called a “quality manual” does not eliminate the need to document and communicate how your QMS is structured.

Many aerospace organizations continue to use a quality manual because it provides a practical way to describe the QMS and its relationship to the applicable requirements — and it’s the document reviewers commonly use to navigate everything else.

Where AS9100 genuinely goes further than ISO 9001 is in the aerospace-specific documented information requirements: first article inspection, more extensive material and process traceability, counterfeit parts prevention, foreign object debris (FOD) control, and configuration management. None of these have a real equivalent in a baseline ISO 9001 system — see What Is AS9100? for the full standard overview if you’re still mapping out scope.

If you’re building this documentation structure from scratch rather than adapting an existing ISO 9001 system, the ISO Documentation Kits for Manufacturers page is a reasonable starting point for the underlying procedures and forms — just plan to adapt anything generic to AS9100’s aerospace-specific requirements before relying on it for certification.


AS9100 documentation requirements showing an aerospace auditor reviewing FAI, traceability, counterfeit parts prevention, FOD control, and process records
AS9100 documentation requirements include objective evidence showing that aerospace parts and processes were controlled as required.

The Core Records Auditors Pull First

First Article Inspection Records

A common audit approach is to select a specific part number and request the FAI record supporting it, along with the traceability behind it. FAI reporting itself is governed by AS9102, published by SAE International. Full requirements — including what counts as a valid FAI and when a re-FAI is triggered — are covered in First Article Inspection Requirements.

Traceability Records

Traceability records should allow applicable material, batch/lot, and process information to be traced through the product lifecycle to the shipped part, based on the organization’s processes and applicable requirements — not just exist as separate records. See AS9100 Traceability Requirements for what Clause 8.5.2 actually demands.

Counterfeit Parts Prevention Records

Documented controls for counterfeit parts prevention are required under Clause 8.1.4 — and auditors check whether they’re actually followed, not just written. Full breakdown in AS9100 Counterfeit Parts Standards.

FOD Control Records

AS9100 expects documented controls and evidence appropriate to the organization’s processes for preventing foreign object debris — the specific form that takes varies by operation. See FOD Control Standards for what Clause 8.5.4 requires.

A recurring pattern I’ve seen: these four record types exist independently but aren’t cross-referenced. An auditor pulls an FAI, asks for the traceability record behind it, and finds no clear link between the two documents — even though both technically exist. In practice, that kind of disconnect often draws more scrutiny than a missing document, because it suggests the system isn’t actually being used to trace parts, just to generate paperwork.

The Audit Trail: Part Number → Revision → Material Lot → Process Route → FAI → Final Record

An auditor doesn’t just want to see that each record in that chain exists individually. They want to see how the records relate to each other and to the specific part in front of them. (This makes a strong visual for the published page — worth building as a simple graphic rather than just text.)

👉 If your traceability records and FAI paperwork don’t reference each other by part number and revision, that’s a gap worth closing before an audit tests it. Download the Manufacturing Compliance Checklist and confirm your records connect.

AS9100 documentation requirements audit trail showing part number, drawing revision, material heat lot, process routing, FAI, and shipped product
AS9100 documentation requirements connect the part number, revision, material, process, inspection, and final shipment into a traceable audit trail.

Two Documentation Areas Most Suppliers Underbuild

Configuration Management Documentation (Clause 8.1.2)

Configuration management — tracking exactly which design revision, engineering change, and customer-approved deviation applies to a given part — gets far less attention than FAI or traceability, but auditors increasingly check it as a standalone item. If your documentation doesn’t clearly show which configuration was in effect at the time of manufacture, that’s a gap worth closing before it becomes a finding. This is dense enough to deserve its own dedicated breakdown — flagging it here as a topic to watch.

Risk-Based Documentation for Special Processes

Special processes — such as welding, heat treating, and nondestructive testing — carry their own documented risk requirements under AS9100’s risk-based thinking clauses. Nadcap accreditation may apply separately when required by a customer or applicable supply-chain requirements; that accreditation question is covered in NADCAP vs AS9100. The documentation angle specifically — how you document special-process risk decisions, distinct from whether you’re Nadcap-accredited — is underserved content-wise and worth a dedicated piece.


How AS9100 Documentation Differs from ISO 9001

CategoryISO 9001AS9100
Quality ManualNot explicitly mandatedNot explicitly mandated, but commonly used in practice
First Article InspectionNo aerospace-specific FAI requirementIncorporated through AS9100 and applicable customer requirements; AS9102 (SAE) governs FAI reporting
TraceabilityGeneral requirement, scope flexibleMore extensive material/process traceability, including customer- and product-specific requirements where applicable
Counterfeit Parts PreventionNo equivalent requirementDocumented controls required (Clause 8.1.4)
Configuration ManagementNo equivalent requirementRequired (Clause 8.1.2)
FOD ControlNo equivalent requirementDocumented controls and evidence appropriate to the organization’s processes and applicable requirements

For the full standard-by-standard comparison beyond documentation specifically, see AS9100 vs ISO 9001.

👉 Building this documentation structure without a consultant is realistic — but only if you’re working from the current edition. Buy the AS9100 Rev D standard through ANSI Webstore and use code CC2026 for 5% off.


What Happens When Documentation Doesn’t Hold Up

A documentation gap doesn’t automatically fail an audit — but an auditor who finds one disconnected record set often digs deeper, and what started as a single finding turns into a pattern of findings across the whole system. That’s the real cost: not the first gap, but what it triggers.

The cost objection: it’s fair to wonder whether this level of documentation rigor is overkill for a small shop with a handful of part numbers. When FAI and traceability requirements apply, a five-person shop and a five-hundred-person supplier may need to maintain the same core record types for a given part number; the difference is the complexity of the system used to manage them.

If you’re deciding whether your existing system is ready, AS9100 Internal Audit Process walks through running that check yourself before a registrar does it for you. And if you haven’t picked a certification body yet, AS9100 Certification Bodies — Ranked & Reviewed is a good next stop — worth confirming the body you choose is itself accredited by a recognized accreditor such as ANAB.

In practice, traceability is a significant part of aerospace QMS auditing because auditors need objective evidence that product and process records can be connected to the requirements they support.


Quick Documentation Checklist

✅ Quality manual (or equivalent scope document) references all applicable Rev D clauses

✅ FAI records exist and cross-reference traceability records by part number and revision

✅ Traceability records identify applicable material heat/lot/batch information for shipped parts, based on customer, product, and process requirements

✅ Documented controls for counterfeit parts prevention are in place and actively followed, not just written

✅ FOD controls are documented and supported by evidence appropriate to the organization’s processes and applicable requirements

✅ Configuration management records show which design revision applied at time of manufacture

✅ Special process records (welding, heat treat, NDT, etc.) are retained per customer and registrar requirements


AS9100 documentation requirements showing the difference between controlled documents and records used as objective audit evidence
AS9100 documentation requirements distinguish controlled information from records that provide objective evidence processes were performed.

FAQ

Is a quality manual required under AS9100 Rev D?

Not explicitly by the standard’s own wording — but many aerospace organizations continue to use one because it provides a practical way to describe the QMS and map it to the standard’s structure. Skipping it entirely can create more audit friction than it saves in paperwork, since certification bodies commonly expect some document that fills that role.

What documents does an AS9100 auditor ask for first?

A common audit approach is to select a specific part number and request the first article inspection record supporting it, followed by the traceability record behind that FAI. Auditors use this pairing to test whether your documentation system actually connects, not just exists.

What’s the difference between documented information and records under AS9100?

Documented information is the broader AS9100 term covering anything required to be created, maintained, and controlled — procedures, work instructions, and forms all count. Records are a specific type of documented information that provide evidence of results, like a completed FAI or a calibration record. Every record is documented information, but not everything documented is a record.

How long do AS9100 records need to be retained?

Retention periods vary by customer contract and registrar requirement rather than a single fixed AS9100 rule — many aerospace customers require retention well beyond typical ISO 9001 timeframes, sometimes for the life of the program. Check your specific customer flow-down requirements rather than assuming a default period applies.

Do I need separate documentation for each customer?

Not necessarily separate systems, but you likely need customer-specific supplemental requirements layered onto your core AS9100 documentation — most aerospace OEMs have their own flow-down requirements beyond the base standard.

What is a common AS9100 documentation finding?

One recurring documentation problem is records that exist individually but aren’t cross-referenced — an FAI with no linked traceability record, or a traceability record that doesn’t tie back to the part it supports. The documents technically exist; they just don’t function as a connected system.

Can I use the same documentation system for ISO 9001 and AS9100?

Largely yes for the shared core structure, but AS9100-specific records (FAI, counterfeit parts prevention, configuration management, FOD control) have no ISO 9001 equivalent and need to be built as additions, not substitutions.

Do I need software to manage AS9100 documentation, or can spreadsheets work?

Spreadsheets can work for a small shop with limited part numbers, but the risk grows with volume — the more parts and revisions you’re tracking, the easier it becomes for records to silently disconnect from each other, which is the exact failure pattern auditors catch most often.

How much documentation does a small aerospace supplier actually need?

The same core record types as a larger supplier — a small shop doesn’t get a reduced list of required records. What differs is the complexity of the system used to manage them; a simpler operation can often meet the same requirements with a leaner, more manual system than a high-volume supplier needs.


📥 Free Resources


Not Sure What to Do Next?

🔹 Still researching what AS9100 documentation actually requires? Start with What Is AS9100? for the full standard overview.

🔹 Ready to build your documentation structure? Buy the current AS9100 Rev D standard through ANSI Webstore — you can’t build compliant documentation from an outdated edition.

🔹 Need training to get your team up to speed? BSI Group’s AS9100 training courses cover documentation requirements clause by clause.

🔹 Want a professional gap assessment first? Download the free AS9100 Rev D Gap Assessment Checklist.

Documentation is where AS9100 audits are actually won or lost — not in the quality manual, but in whether your records connect to the parts they’re supposed to trace. Get the structure right from the beginning, and maintaining audit-ready evidence becomes far easier. That’s the standard The Standards Navigator holds every AS9100 guide to.


Stay Ahead of Your Next AS9100 Audit

Most aerospace suppliers don’t fail audits because they lack documentation — they fail because their documentation doesn’t connect. FAI records that don’t reference traceability. Traceability that doesn’t tie to configuration. Individually complete, collectively disconnected.

Suppliers who struggle treat documentation as a checklist exercise, built once and left alone. Suppliers who succeed build cross-referencing into every record from day one, so nothing has to be reconstructed under audit pressure.

The Standards Navigator covers AS9100 implementation for aerospace suppliers building audit-ready quality systems from the ground up.

👉 Get updates on AS9100 and aerospace compliance

👉 Be first to access new gap assessment checklists and documentation templates

Subscribe

* indicates required

Industrial Compliance. Clearly Explained.

First Article Inspection Requirements: What AS9100 Suppliers Must Document in 2026

AS9100 requires First Article Inspection under Clause 8.5.1.3, documented per AS9102 Rev C. This guide breaks down the five triggers that require a new FAI, the three required forms, and the most common reasons FAIRs get rejected by customers and auditors.

A clause-by-clause guide to AS9102 Rev C and the FAI process aerospace suppliers can’t afford to get wrong

Affiliate Disclosure: Some links in this article are affiliate links. If you purchase through them, The Standards Navigator may earn a commission at no additional cost to you.


The Part That Passed Inspection — And Still Got Rejected

Understanding First Article Inspection requirements under AS9102 Rev C is what separates a smooth AS9100 audit from a stalled one — and a part can measure perfectly on the CMM and still get bounced back to the supplier. Not because the dimensions were wrong. Because the paperwork proving those dimensions was incomplete, unsigned, or missing a required characteristic.

That’s the trap most new AS9100 suppliers fall into with First Article Inspection, or FAI for short. They treat it as a formality — something to knock out after the part is built. In reality, AS9102 Rev C is a documentation standard with specific, auditable requirements, and a customer or auditor can reject an otherwise flawless part on FAIR completeness alone.

If you’re preparing for your first AS9100 certification, building your first FAIR package, or trying to figure out why your last one bounced, this guide breaks down exactly what AS9102 Rev C requires — and where suppliers lose the most time.

From the Floor: I’ve sat across the table from an auditor reviewing first-piece documentation on a new fabrication run, watching a supplier get flagged not because the part was out of tolerance, but because the characteristic accountability record didn’t trace back to the drawing revision in use. That’s the kind of finding that stalls a contract review meeting for weeks. The part was fine. The paper trail wasn’t — and in an audit, the paper trail is the part.

👉 Before you submit your next FAIR, run it against a clause-by-clause gap check first. Grab the free AS9100 Rev D Gap Assessment Checklist — a 74-item, section-by-section review built for aerospace suppliers who need to know exactly where their QMS stands before a registrar does.


In This Guide

  • What First Article Inspection requirements actually cover, and why AS9100 requires them
  • The five triggers that require a new or partial FAI
  • AS9102 Rev C’s three forms, explained field by field
  • Full FAI vs. partial (delta) FAI — and how to tell which one you need
  • The most common reasons FAIRs get rejected
  • How FAI connects to AS9100 Clause 8.5.1.3
  • A quick audit checklist you can run before your next submission
  • Where to buy AS9102 Rev C and how to prepare your team


👉 Start Here: Top Resources

  • AS9100 Rev D Gap Assessment Checklist — free 74-item checklist to confirm your QMS (including production process verification) is audit-ready before your registrar shows up.
  • 9001Simplified — pre-built documentation templates that give your FAI and nonconformance records a structured home instead of scattered spreadsheets.
  • AS9102 Rev C — ANSI Webstore — the current edition of the standard governing FAI reporting.
  • BSI Group AS9100 Training — structured AS9100 training if your quality team needs a working understanding of Clause 8.5.1.3 before your next internal audit.

What Is a First Article Inspection?

Quick answer: First Article Inspection (FAI) is a documented verification that a representative part from a new or changed production process meets all engineering, material, and specification requirements. Aerospace suppliers typically document FAI using AS9102 Rev C forms.

These First Article Inspection requirements apply the moment your AS9100 certificate covers a new part number — they’re not an optional add-on you can defer until an audit forces the issue.

It’s not a sampling plan. It’s not a spot check. AS9100 Rev D, Clause 8.5.1.3 (“Production Process Verification”), requires a representative item from the first production run — or from a process that has changed enough to invalidate a prior FAI — to be fully inspected, verified, and documented.

The distinction matters because FAI isn’t optional guidance layered on top of AS9100. It’s a clause requirement. If your AS9100 certificate is active, your ANAB-accredited registrar expects to see FAI records, and expects them to follow the format your customers specify — which, for the overwhelming majority of aerospace primes, means AS9102 Rev C.

If you are new to aerospace supply chains and still mapping how AS9100 differs from the ISO 9001 system you already run, our AS9100 vs. ISO 9001 breakdown covers the additional aerospace-specific clauses, FAI included.


AS9102 Rev C: The Standard Behind the Requirement

AS9102, maintained by SAE International’s Aerospace Standards Committee, defines the format and content of the First Article Inspection Report (FAIR). The current edition — Rev C, released in June 2023 — replaced Rev B and remains the version most primes and Tier 1 customers require today.

Rev C tightened accountability. Every bill-of-materials part tied to the assembly — detail parts, sub-assemblies, and commercial off-the-shelf (COTS) items alike — now has to be explicitly listed. Special process suppliers (heat treat, NDT, plating) are explicitly in scope: they can satisfy the requirement by producing their own FAIR or by documenting characteristics and results on a detailed certificate of conformance. The signature structure also changed — a single Form 1 signature now locks all three forms, instead of requiring separate sign-off on each.

Most customers will still accept Rev B templates on legacy programs through 2026, but new contracts increasingly specify Rev C by default. There’s no upside to staying on the old forms.

AS9102 Rev C — ANSI Webstore is the authoritative source for the current text — worth the purchase before you build or revise your FAI templates internally, since secondhand summaries (including this one) don’t replace the primary document during an audit.


When FAI Is Required — The Five Triggers

Infographic explaining First Article Inspection requirements by illustrating the five events that trigger a new or partial AS9102 Rev C First Article Inspection under AS9100.
Five specific events trigger a new or partial First Article Inspection under AS9102 Rev C, making it essential for aerospace suppliers to recognize when FAI documentation must be updated.

FAI isn’t a one-time event tied to a single part number. AS9102 defines five specific triggers, and any one of them requires a new FAI — or at minimum, a partial one:

  1. First production run of a new part. Always required, no exceptions.
  2. A design change. Any engineering change order or drawing revision that affects fit, form, or function.
  3. A change in manufacturing source. New supplier, new plant, or a significant process change at an existing supplier.
  4. A change in process or material. New heat treat cycle, new alloy lot source, new raw material vendor.
  5. A lapse in production exceeding two years. Even if nothing else changed, the gap itself triggers a re-FAI.

If you are already certified to AS9100 and building your first aerospace part number → treat trigger #1 as non-negotiable. Skipping it is one of the fastest ways to generate a serious audit finding during a surveillance audit or customer assessment. If you’re still mapping out your certification schedule, our AS9100 Implementation Timeline guide shows where FAI readiness fits into the overall process.

If you’re mid-contract and just received an ECO → check trigger #2 before you release the revised drawing to the floor. A full FAI isn’t always required here — see the partial FAI section below.


The Three FAI Forms Explained

AS9102 requires three forms, and each one covers a different layer of accountability.

FormPurposeKey Content
Form 1Part Number AccountabilityPart number, part name, serial number, FAIR number, drawing revision, full vs. partial FAI designation, single locking signature
Form 2Product AccountabilityMaterials, special processes, functional test requirements, and the specifications each one is verified against
Form 3Characteristic AccountabilityEvery ballooned characteristic from the drawing, the requirement, the actual measured result, and the verifying method

Form 1 is the cover sheet — it identifies the part and locks the package once signed. Form 2 tracks every material, special process, and functional test called out on the drawing, cross-referenced to its governing specification. Form 3 is where the detail lives: every dimension, tolerance, and note on the drawing gets a balloon number, and that number has to trace directly to a measured, documented result on Form 3.

Most common finding: auditors and customer quality reps most often reject FAIRs not for measurement errors, but for characteristics on the drawing that never made it onto Form 3 at all — a missed note, a General Datum requirement, or a material callout in the title block that nobody ballooned.


Full FAI vs. Partial (Delta) FAI

Comparison infographic showing the differences between a Full First Article Inspection and a Partial (Delta) First Article Inspection under AS9102 Rev C for AS9100 aerospace suppliers.
Understanding when to perform a Full FAI versus a Partial (Delta) FAI helps aerospace manufacturers maintain compliance while avoiding unnecessary inspection and documentation effort.

Not every trigger requires rebuilding the entire FAIR from scratch. AS9102 Rev C distinguishes between:

  • Full FAI — every characteristic on every form is inspected and documented. Required for the first production run of a new part, or when the scope of a change is broad enough to affect the majority of the part’s characteristics.
  • Partial (delta) FAI — only the characteristics or processes affected by the specific change are re-inspected, with a clear reference back to the baseline FAIR that covers everything else.

Example: Changing a hole diameter from .250″ to .312″ typically justifies a partial FAI focused on the affected characteristics. Changing the manufacturing route, material specification, and drawing revision at the same time typically pushes it into full-FAI territory instead.

If you’re unsure which one your ECO requires → don’t guess. Map the change directly to the specific characteristics it touches, and document that mapping as part of your FAI plan. An auditor will ask you to justify a partial FAI determination, and “we assumed it was minor” is not an acceptable answer.

That re-accomplishment logic needs to live in a controlled, rev-managed document that defines in advance what counts as a full trigger versus a delta trigger for your product lines. Waiting until the ECO lands to figure this out is how full FAIs get triggered by mistake — burning inspection hours a documented plan would have avoided.


Common First Article Inspection Mistakes

The failure patterns repeat across shops of every size:

  • Incomplete characteristic capture. Notes, general tolerances, and material callouts buried in the drawing’s title block get missed during ballooning.
  • Missing special process evidence. A part goes out for heat treat or NDT, and the FAIR references the process but doesn’t include the supporting cure chart, pyrometry data, or inspection record.
  • No documented full-vs-partial rationale. A delta FAI gets submitted with no record of why it was scoped that way.
  • Signature and revision mismatches. The drawing revision on Form 1 doesn’t match what was actually used to inspect the part — often because the drawing was revised mid-production and nobody updated the FAIR.
  • Treating FAI as a one-time event. No plan exists for what happens after a two-year production gap, so the re-FAI requirement gets missed entirely.

If your last FAIR bounced and you’re not sure why → work backward from Form 3 first. That’s where the majority of rejected packages have their root cause, not Form 1 or Form 2.

👉 Most shops don’t fail FAI review because they misunderstand the standard — they fail because a characteristic never made it onto the ballooned drawing in the first place. Run the AS9100 Gap Assessment Checklist before your next submission and catch it before your customer does.


How FAI Connects to AS9100 Clause 8.5.1.3

FAI isn’t a standalone requirement — it’s the mechanism AS9100 uses to satisfy Clause 8.5.1.3, Production Process Verification. The clause requires organizations to verify a process is capable of consistently producing conforming product before that process runs for volume production. AS9102 is how you prove that verification happened, in a format customers can audit against.

This is also where the objection comes up most: does a small shop with only a handful of aerospace part numbers really need full AS9102 compliance, or is this a Tier 1 problem? The clause doesn’t scale by company size. If your QMS is certified to AS9100 and you’re producing a part for the first time, Clause 8.5.1.3 applies whether you’re a 15-person job shop or a 500-employee Tier 1 supplier. What scales is the complexity of the part — not whether the requirement exists.

For the accreditation and certification-body side of this, IAQG maintains the governing framework for AS9100 quality management, and the IAQG OASIS Database is where certified suppliers’ AS9100 status gets verified by customers and registrars.


Quick FAI Audit Checklist

Run this before you submit your next FAIR:

  • ✅ Every note, tolerance, and callout on the drawing — including the title block — has been ballooned
  • ✅ Form 1’s drawing revision matches the revision actually used for inspection
  • ✅ Special process evidence (cure charts, pyrometry, NDT records) is attached, not just referenced
  • ✅ Full vs. partial FAI determination is documented with a rationale, not assumed
  • ✅ Sub-tier or COTS characteristics are accounted for per the BOM, not just the top-level assembly
  • ✅ Single Form 1 signature is present and dated correctly under Rev C rules
  • ✅ Two-year production lapse tracking exists somewhere in your quality system — not just in someone’s memory
Infographic showing a seven-step FAIR submission checklist under AS9102 Rev C, including documentation, signatures, BOM accountability, and two-year production gap tracking for AS9100 compliance.
Use this seven-step FAIR submission checklist to verify your First Article Inspection package is complete before submitting it to a customer or auditor.

⚠️ If you can’t check every box above with confidence, that’s a gap assessment conversation, not a “we’ll catch it next time” conversation.


FAQ

Is First Article Inspection required under AS9100, or is AS9102 just a recommendation?

FAI itself is a clause requirement under AS9100 Rev D, Clause 8.5.1.3. AS9102 is the SAE standard that defines the documentation format for that requirement — it’s not certified separately, but nearly every aerospace customer specifies it as the expected format for FAIR submission.

What’s the difference between AS9102 Rev B and Rev C?

Rev C, released in 2023, tightened bill-of-materials accountability (requiring every BOM item — detail parts, sub-assemblies, and COTS — to be listed), brought special process suppliers explicitly into scope, and simplified the signature structure so a single Form 1 signature locks all three forms instead of requiring separate signatures on each.

Do I need a full FAI every time a drawing changes?

Not necessarily. If the change affects only specific characteristics, a partial (delta) FAI that documents just those characteristics — with a clear reference back to the original FAIR — is acceptable, provided the full-vs-partial determination is documented and justifiable.

How long does a First Article Inspection take?

Completed manually, a single FAIR can take a full day per part, depending on characteristic count. Ballooning software that links balloon numbers directly to Form 3 has cut that time down substantially for shops with high part-number volume, though the underlying inspection and documentation work doesn’t disappear — it just moves faster.

Does a lapse in production really require a brand-new FAI even if nothing changed?

Yes. A production gap exceeding two years triggers a re-FAI under AS9102, regardless of whether the drawing, process, or supplier changed. The rationale is that tooling, gauges, and personnel can all drift over a two-year gap even without a documented change.

Who is responsible for FAI on parts that go out for special processing?

The special process supplier (heat treat, plating, NDT) is explicitly in scope under Rev C. They can satisfy the requirement either by producing their own FAIR for their portion of the work, or by documenting the relevant characteristics and results on a detailed certificate of conformance that the prime contractor’s FAIR references.

Can a small job shop with only one or two aerospace part numbers skip formal FAI documentation?

No. Clause 8.5.1.3 applies to any organization certified to AS9100 producing a new or changed part — company size and part-number volume don’t change the requirement, only the scale of the inspection effort.

Where do I buy the current AS9102 Rev C standard?

AS9102 Rev C — ANSI Webstore carries the current edition. If you’re also purchasing or renewing the base AS9100 standard, the ANSI bundle option is worth checking — buying related aerospace standards together typically costs less than purchasing each one separately.


📥 Free Resources

  • ISO 9001 Roadmap — step-by-step implementation guide for manufacturers building or improving a quality management system.
  • Manufacturing Compliance Checklist — practical compliance reference covering key ISO, OSHA, and quality requirements for production environments.
  • Supplier Quality Checklist — evaluation tool for assessing supplier quality controls and flow-down compliance before audits or new contracts.
  • ISO 13485 Gap Assessment Checklist — free checklist for medical device manufacturers assessing their QMS against ISO 13485 requirements.
  • AS9100 Rev D Gap Assessment Checklist — 74-item clause-by-clause checklist for aerospace suppliers assessing their QMS before certification, including production process verification and FAI readiness.

Not Sure What to Do Next?

🔹 Still researching how FAI fits into your AS9100 QMS? Start with our What Is AS9100? pillar guide, or see how the standard compares to the ISO 9001 system you may already run in our AS9100 vs. ISO 9001 breakdown.

🔹 Ready to build or clean up your FAI documentation process? 9001Simplified’s documentation templates give your quality team a structured starting point instead of building FAI and nonconformance records from a blank spreadsheet.

🔹 Need to purchase the standards themselves? [AS9102 Rev C — ANSI Webstore] covers the FAI reporting format; the SAE/AS9100 standard series covers the base QMS requirement. Use code CC2026 for 5% off through December 31, 2026.

🔹 Need your team trained on Clause 8.5.1.3 and production process verification? BSI Group’s AS9100 training courses cover the clause requirements behind FAI in detail.


FAI documentation is one of the clearest places where AS9100 suppliers either build a habit of audit-readiness — or build a habit of scrambling. Get the forms right the first time, and every FAIR after that gets faster. That’s the standard The Standards Navigator holds every aerospace article to: Industrial Compliance. Clearly Explained.


Don’t Let a Missing Balloon Number Be the Reason Your FAIR Gets Rejected

Most FAI rejections don’t happen because a supplier doesn’t understand tolerances. They happen because a characteristic never made it onto a balloon number, or a signature landed on the wrong revision.

Shops that build a documented FAI plan — one that spells out full-vs-partial triggers before an ECO ever lands — spend inspection hours on the floor. Shops without one spend those same hours re-explaining themselves to a customer quality rep.

The Standards Navigator tracks AS9100, AS9102, and the aerospace-specific requirements that don’t show up in a generic ISO 9001 checklist — built from the floor up, not from a training manual.

👉 Get updates on AS9100 and aerospace quality requirements
👉 Be first to access new aerospace gap assessment and documentation resources

Subscribe below to stay ahead.

Subscribe

* indicates required

The Standards Navigator — Industrial Compliance. Clearly Explained.